Before a trial, record the material specification, mould status, machine setup and the drawing revision used for review. Define how samples will be identified and which appearance, dimensional and assembly checks will be performed.
During the trial, connect each sample with the process settings and observations. Note visible marks, trapped-gas indications, local sink and dimensional deviations without treating one sample as proof of production capability.
What to review on the samples
Plan the next verification
After the review, separate product-design questions, mould corrections and process experiments. Assign the evidence and confirmation needed for the next check before changing the agreed scope.
